Last week, the county permit office said that the engineered electrical drawings we submitted had to be “stamped” engineering drawings, and ours were not. OBIC is in the process of getting bids for stamped drawings. This will probably delay the project for 5-6 weeks before the permit is approved.  

Once we have a permit in hand, we can set schedule for the project. Since the weather has turned, we should be able to begin both the outside work and inside work (inside work will require coordination with Cradlerock Children’s Center).  We should anticipate a few days of parking lot disruption when we run the conduits out to the charging station locations.